Know the traffic answer before you commit to the site.
Traffic mitigation can make or break a project’s budget and schedule. LaneMarker shows the trips, the affected intersections and the likely mitigation early — while the site plan can still change.
- Mitigation costs discovered late
- Access and driveway layouts redesigned after review
- Long waits for a first traffic opinion
Early feasibility
Trips, distribution and LOS for a candidate site in hours.
Test site plans
Compare land-use mixes and access points before design is locked.
Fewer surprises
See where the project triggers mitigation and what its fair share might be.
Your toolkit in LaneMarker AI Studio
Trip Generation & Distribution
Turn land uses into AM and PM trips, then distribute and assign them movement by movement — with every percentage justified and editable.
Learn moreTraffic Impact Studies
Scope, analyse and write the full TIA — existing, opening-year and horizon scenarios, mitigation and fair share — with figures and tables ready for submittal.
Learn moreEIR Transportation Analysis
The transportation analysis behind your EIR — existing, project, no-project and cumulative scenarios, LOS, queues and mitigation, drafted for CEQA and NEPA documents.
Learn moreTraffic Simulation
Microsimulate the network you built — in 2D or 3D — to see queues, spillback and how mitigation actually performs.
Learn moreSee your own study area in LaneMarker AI Studio.
Bring a corridor or a site you are working on. In 30 minutes we will build the network, run the analysis and show you the report — on your project, not a canned demo.